Team Mileage report is based on scheduled times - job allowed hours and team scheduled hours. Spotlight dashboard is based on actual job/clock times.
Team Mileage Report:
Efficiency = Team Allowed Job Time / Team Scheduled Clock Time (using the team captain's schedule) Does not normalize job time or use Google drive times.
Spotlight Dashboard:
Efficiency = Team Actual Job Time / Team Actual Clock Time
Comments
0 comments
Please sign in to leave a comment.