Scheduling -
The planned/default team size is managed from within each Scope of Work.
Each Scope of Work has its own planned/default team size. To change a Scope of Works Default Team Size follow the below steps.
- Choose Company > Quoting & Scopes
- Go to the Scopes of Work section on the Left-Hand Menu
- Each Scope has a column that states the Planned Team Size (the number of people icons is the number of planned technicians per job within this scope)
- Click into a Scope and choose the Technician Settings tab on the Top Menu
- Choose a Planned Team Size and click Save
Comments
0 comments
Please sign in to leave a comment.